The project involves the construction of the Ghasemabad Grand Bridge on the Tehran-Mashhad Railway to convert flat interchanges og non-grade ones. Operations are concluded at Ghasemabad bridge which is a 17 crater bridge with a length of 610 meters and has 100 piles of 25 to 30 meters ,and 85 Girders of 24 meters.
Drilling piles of 25 meters.
Concreting Concrete piles.
Concrete columns.
Concrete stands including columns and heads.
Concrete 24 meter Girders.
Facilities for creation, Transportation and Execution of Concrete .
On-site Batching Plant.
On-site Batching Plant.
Precast Concrete Girders.
Reinforcement of the Girders.
Controlling the Concrete Girders Formwork.
Concreting of the Girders.
Concreting of the Girders.
Reinforcing Bridge Piles.
Precast Concrete Girders.
Machine-drilling of in-situ piles.
Machine-drilling of in-situ piles.
Loading and Transportation of 24m RC Girders for installation.
Installation of 24m RC Girders.
Installation of 24m RC Girders.
Mixing plant for concrete production.
Structure of the Northern Ramp of the Bridge.
A view of Construction site of the central part of the Bridge.
A view of Installation of the Girders.
A view of the Installed Girders.
A view of the Execution of the metal Deck.
Aerial Picture From Project Site and Finished Construction.