The project involved the construction of 18 railway lines, each about 4 km long, to develop the dry Docks of Aprin.
Lime dispersions to consolidate the substrate.
substruction of Railway lines.
Mapping of Dry Docks Substructure.
Excavation of the Dry Docks.
Offloading Lime for better Stabilization.
Parking place of the central part of the project’s Machinery.
Testing Soil Mechanics.
Distribution and Density Operations.
Distribution and Density Moisturizing Operations.
Substructure Building operations.