The purpose of this project is to construct a two-lane crossing under the Fatah highway towards Shahriar Road. Implementation of the project is from below 10 traffic bands, consisting of 2 Slow lanes and 3 Fast lanes in each direction, and traffic management has been done with traffic diversion. The Underpass is about 700 meters long, with about 2000 square meters of bridging and the construction of more than 300 piles.
Paving the Route.
Paving the Route.
Paving the Route.
Mapping The Project.
Shaving Old Asphalt .
Asphalting performance between Fatah highway Fast lanes (Shahriar Road).
Drilling the Piles for the Underpass.
Reinforcing of the Piles.
Reinforcing of the Piles.
Concreting the Piles.
Production of Concrete by on-site Batching Plant.
Reinforcment of the Underpass Deck.
Reinforcment of the Underpass Deck.
Formwork and Reinforcement of the Deck.
concreting the Deck.
concreting the Deck.
concreting the Deck.
Concrete Deck.
Excavation of Underpass Ramp.
Excavation of Underpass Ramp.
Excavation of Underpass Ramp.
Leveling of Underpass Ramp excavation operations.
Excavation of the Deck.
Excavation of the Deck.
Excavation of the Deck.
Phased Traffic Diversion for Executing the Deck and the Piles.
Excavation of the Piles.
Excavation of the southern Deck.
Reinforcement of the southern Deck.
Reinforcement of the southern Deck.
Preparing the Underpass.
Preparing the Underpass.